| Specification
(Tolerance) Limits are the limits on the
dimension etc. of a characteristic imposed
by the designer, or the customer. The onus
is on the producer/supplier to ensure that
the process can achieve the specifications
to the required process capability value.
Process
Capability Studies are a key
tool in determining whether a process is
'capable' of consistently achieving the
specifications.
|